Saturday, November 21, 2015

Color me calmer

I saw the apartment today and a lot has been done. I feel very confident that it will be ready by the move-in date of December 4th.
Once the windows arrive next week (please Lord), then everything else should fall into place nicely.
The rest is small stuff (lighting and plumbing fixtures, hardware, etc) and the final paint job.
I'm getting very excited and cautiously optimistic--I've been burned before with false starts and setbacks on this whole journey!
Here's a another mega-post of pictures, some with descriptions of things I'm happy about.
Could the end really be in sight??

Pan looking into main room

Pan of main room looking into hallway

Living room 'feature' wall; all to be painted a high gloss gray paint, flatscreen TV above mantel

Built-in shelving to right of mantel

Built-in shelving to right of mantel

Love the marble on the bottom shelves here

Marble sill in place on the picture window

Living room window, AC unit will go below

Mantel

The mantel's medallion in place, very handsome now

Interior brickwork of firebox looks good, will be painted black

Pan of shower in bathroom; glass shower door to come

Bathroom medicine chest and window


Tiling in shower

Linen closet in bath

Ceiling tile detail in bathroom

Hallway closets and dining niche


Dining niche; outlet is for lighting fixture

View of dining niche from bath

Two closets coming here, they'll be covered with accent wall

Door to bathroom

Kitchen cabinets above sink; I like the putty gray color we chose

Kitchen marble counter

Stove area in kitchen with cabinetry above

Where stove will be placed

Marble spice shelf above stove

Detail of tile crown molding in kitchen

Kitchen window with marble sill

Fridge nook

View of entryway from main hallway

Entryway; I'm trying to convince Steve that we should paint this a  dark color



Thursday, November 19, 2015

Say it isn't so

Today's mood
So Steve, my architect, emailed me today to say that the windows were NOT going to be arriving this week as originally planned. I could spit nails. This is the SECOND postponement this damn window company has handed us. These things better look awesome or I will happily provide the name of the company to anybody who wants it so that you don't end up in the same situation as I am with them.
In any event, it's good that I pushed back the move in date. Now we're told that the windows will arrive FOR SURE next week. Anybody wanna place their bets?

Monday, November 16, 2015

Not so fast!

I met Steve and Guillermo--the architect and contractor--at the apartment this morning to kick off the last week of construction before the furniture arrives next week. I thought it best to see what progress has been made...and how much still needs to get done in the home stretch.
It's a good news/bad news situation: the good news is that a lot more has gotten done and it looks GREAT, very happy with the results. The bad? In my estimation there's still way too much to finish in just FIVE working days. Guillermo assured me that the place would be "transformed" by this friday and that they'd be ready, but I disagree. I don't want all that furniture and all those boxes sitting in an already stuffed-to-the-gills space when the workers are still finishing. So I decided to postpone the moving date to the end of the following week, to Friday December 4th. This will give the workers ample time to get everything done and to do it RIGHT. Happily this change didn't cost me anything.
Here is a mega-post of pics now, I LOVE how things are looking.
The millwork around the mantel on the feature wall is now in place, still needs to be painted and the wall behind the mantel needs plastering and finishing detail. The inside of firebox needs finishing and painting too.








Here are some views looking into the main hallway. The main room is holding all the appliances and plumbing fixtures in boxes, they're waiting for the tiling and windows to be finished.


The fridge



The casement windows have not arrived yet; they were due last week but no dice yet. You can see from these pics that the room is open to the elements except for the main picture window. It has plastic over it. The carrera marble sills have been put in place.





Picture window covered with plastic

Marble window sills are in place

No windows: looking down into the courtyard


The bathroom tiling is almost done. Once windows go in, the fixtures get installed.


Bathroom window missing

Linen closet in bathroom
The entry hallway closets are in and look fantastic, I'm very happy with how much storage there is! The dining niche also looks adorable...it even has a storage drawer underneath. We're moving the light source from the left side to the right side; the café table I'm hoping to put there will look better on the right side, thus the switch.


The electrical panel right inside front door

Entryway coat closet

View of main hallway closets from kitchen

View inside one of the closets

The dining niche


The tiling in the kitchen is all done. Next up after the window gets installed is the kitchen cabinetry and appliances, all happening this week.

Waiting for the stove

Kitchen window


Doors which will enclose the washer/dryer in kitchen