Well, it's all still a mess...but you can tell things are moving along, albeit slowly.
This week the major internal plumbing went in.
This picture is so scary but it's the inside guts of the plumbing work that will never be seen, the stuff below the floor.
|
The hidden plumbing |
Here's the electrical panel that will be in the entryway as soon as you enter the apartment, there was really no other place to locate it. Steve and I decided that I'll have to cover it with a picture or a painting, no worries. Easy solution.
|
Electrical control panel in entryway |
At lot of work was done on the electrical wiring that snakes through the ceiling spaces. You can also see in these shots where the ceiling lighting fixtures are being located.
Finally, here's a shot from the main room looking back into what was formally the gallery space and what I'm now calling a hallway.
It's good to see things moving along, just wish it could all happen faster! Patience, Ron, patience...