Anyway, I should be happy that there's a light at the end of the tunnel.
The windows are to arrive TODAY (?)...at least that's the plan. The window company wanted to delay ANOTHER day earlier in the week, so it's a good thing I pushed back the move-in date to next Wednesday. That will hopefully give us time to install the windows and finish off the trim and tiling around them.
Here's the latest update photos...a lot of fixtures and shower door were installed in bathroom...radiator in living room is in place...kitchen appliances are in place too. Other than the toilet and medicine cabinet the two big major things left are the windows (of course) and the curved wall in the hallway. We're holding off on that til after the windows arrive so that it won't get banged up bringing in those big things.
Shower doors |
Shower floor |
Sink; radiator needs stripping; medicine chest to come |
Hall drawers; curved wall to be installed next week |
Floor in front of stone hearth |
Living room radiator; that's an electrical outlet, plate coming |
Kitchen |
Kitchen |
Stove/oven/hood |
gorgeous Bro!!